Some things have to be learned in order. In Teachfloor you can lock an activity, a lesson or a whole course until something else is completed, open lessons on a date, and show activities only to some learners. This guide covers:
requirements on activities;
requirements, dates and visibility on lessons;
courses that require another course;
what learners see;
how to make exceptions.
đĄ Note: in the screenshots the academy calls its courses "Trainings" and lessons "Modules". In your academy the same menus may say "Courses" and "Lessons". The example course is Forklift Operator Training, for the fictional company Northwind Logistics.
Step 1 â Activity requirements
1. Lock an activity until another one is done
In the example, the lesson On the forklift has two activities: Forklift controls and a Practical driving assessment that should only open after it.
Open the activity that should wait, click "Edit" and go to the Requirements card. In "Requirements", pick what must be completed first. The list includes activities and whole lessons (marked "Module").
Every item in the list must be completed before the activity unlocks.
Requirements are based on completion, not on a quiz score.
Step 2 â Lessons: requirements, dates and visibility
2. Requirements on a lesson
Open the lesson, click "Edit" and use the Requirements card in the lesson settings, for example to make On the forklift require the whole Before you drive lesson.
3. Open a lesson on a date
"Module Availability" can be "Continuous" (always open) or "Scheduled", with a start and an end date. The lesson stays locked until the start date.
4. Visibility rules
The Visibility card decides who sees an activity at all. "Add Rule" offers:
"Tags": learners with certain tags;
"Select Users": people you choose;
"Roles": a type of user;
"Reveals At" and "Hides At": show or hide the activity at a date and time.
With two or more rules, you choose whether learners must match all of them or at least one. Without rules, all learners can see the activity. Visibility rules depend on your plan.
Step 3 â Course prerequisites
5. Make a course require another one
Open the course, go to Training (the course page), click "Edit" and find the Requirements card. Add the courses that must be completed first, here Warehouse Safety Compliance 2027.
Only published courses count as prerequisites.
Learners can still join the course, but its content stays locked until they complete the required courses.
Step 4 â What learners see
6. A course they can't open yet
When a learner opens a course without having completed its prerequisites, a window lists the courses to complete first ("Prerequisite courses required").
7. A locked activity
Locked activities are greyed out with a lock icon. Clicking one shows "LESSON REQUIREMENTS" with a link to each item still to complete. Once those are completed, the activity opens.
Step 5 â Exceptions
8. See who is locked out
In the course's Progress tab, activities a learner can't open yet show as "Locked".
9. Unlock by hand
Click the learner's status on the required activity and choose "Mark as Verified". It counts as completed, so the activity that depended on it unlocks.
Good to know
Admins and people who edit or assess the course can always open every activity; requirements apply to learners.
There's no "either/or" between requirements, and no requirement based on a score or on days since enrolment.
If you duplicate an activity or a lesson inside the same course, its requirements are not copied.